|
Meter Testing Service
No matter how you manage your current meter testing program, you'll find you can improve staff allocation, increase revenue, and reduce unaccounted for water with an automated, online system. All you need is a connection to the Internet.
Our online Meter Testing Service allows you to create a database of all your large and high-usage meters and record information including annual usage, install date, and the brand and type of meter. Record and save test dates and results and the next date the meter should be tested. The system helps determine which meters to test and in which order to test them, based on the most potential for return.
In most cases, meters are tested at the AWWA suggested flow rates for the size of meter. This is a sound basis for determining the condition of a meter, but it does not provide enough information to accurately determine the financial impact of replacing the meter. To accurately predict the financial gain or loss of replacing a given meter we need to know the flow rates at which the customer uses water. For example what does a test at 250 gallons per minute tell us about the financial impact of a meter that never has flows of over 100 gallons per minute?
To make the best possible use of your meter testing data, it is necessary to know how much of a meters flow is at each of the test flows. This is most accurate if the meter has been flow recorded, and this data is used to determine the best flow rates at which to test. When this data is input into the financial analysis section of our meter testing program, an accurate assessment of the financial impact can be projected. This data is input into our easy-to-use form. When you maximize the financial impact of your meter testing program, the program does not cost – it pays.
Your data will be secure and available in easy-to-use reports that can be printed or saved on your computer. In addition to a comprehensive list of standard reports, custom reports can be provided to meet your individual needs.
Forms and instructions have been designed to be quick and easy to use for your meter testing staff. Very little, if any, administrative staff are needed to implement and manage this program.
Assistance can be provided online, by phone, or at your office.
Features:
- Schedule the entire meter program
- Reports of meters to test
- Reports of meters tested
- Reports of test results
- Work order in meter test format
- Reports may be exported for use with Excel
- Overdue meter test displayed on your home page
- Financial analysis of test results
- Track test equipment calibration
|